1·Tunnelling machines - shield machines, thrust boring machines, auger boring machines, lining erection equipment - safety requirements.
隧道掘进机。盾构机止推钻孔机螺旋钻探机衬里安装设备。安全要求。
2·The construction technique of CFG piled composite foundation by long auger boring methodology is studied and summarized according to the project of China Film Museum.
针对中国电影博物馆工程使用长螺旋钻管内泵压CF G桩复合地基施工技术作了一些有益的尝试、研究和总结。